Assume that angler industries allocates overhead using a plantwide overhead rate based on machine hours. how much total overhead will be assigned to a product that requires 1 direct labor hour and 2.70 machine hours in the assembly department, and 3.50 direct labor hours and 0.8 machine hours in the finishing department?